CASE STUDIES


Description

A testament to the skill and expertise of all involved, the bridge adheres to standards of design and construction that have won two 2013 Canadian Institute for Steel Construction Awards. Now, with nearly 6,000 users a day the Peace Bridge is at the heart of Calgary’s downtown community. Read More

Description

The Huntley Bridge was one of five in West Prince that washed out during heavy flooding on December 2014. The bridge was constructed using a 200 mm cast-in-place deck slab over pre-cast pre-stressed NEXT F Beams with partial-depth flanges serve as formwork. The beams were simply supported over a single span of 20 m. Read More

Description

Constructed at Pokemouche, New Brunswick in 2015-2016 on route 113. Six-span slab-on-girder bridge supported on five piers and two abutments with at total length of 130 m. The bridge was rehabilitated and new 197-mm retrofired slab supported on five AASHTO Type III girders spaced at 1829 mm were constructed. Read More

For Sustainable Construction Solutions